UBS Christmas show

About the project

We were tasked with the projection design, planning, technical design, content production, hardware installation and playback for this project.

Again as many of our projects start we produce a 3D model of the building and the environment for our own planning, design, storyboarding, and content production needs.

The agency involved in this project agreed to use the building opposite to house the projectors and show control. We used 6 x 21,000 lumen Panasonic projectors housed in an environmentally designed enclosure.

The show control was through our Avolites AI media servers with system housed alongside the projection location. We set up cameras so the show could be monitored throughout the 40day duration. The show was timed to come on every day at sun set and we programmed a show every 10mins throughout the night until 11.30pm.